Nationwide UK Racking Specialists · Est. 2002
Case study

Pallet Racking Relocation - 23-Bay Warehouse Racking System

Twenty-three bays of heavy-duty pallet racking dismantled, sorted, banded and moved approximately one mile.

New premises approximately one mile away
Heavy-duty pallet racking bays before dismantling and relocation
The project

Dismantling and moving a 23-bay pallet racking system

Twenty-three bays of heavy-duty pallet racking were dismantled and relocated to new premises approximately one mile away.

The system included approximately 5-metre-high, 900mm-deep racking frames with 2.7-metre beams across three storage levels.

Every component, including beams, frames and braces, was sorted and securely banded for transport before being unloaded and stored ready for future rebuilding.

Project facts
  • 23 bays of heavy-duty pallet racking
  • Approximately 5-metre-high, 900mm-deep frames
  • 2.7-metre beams across three storage levels
  • Moved approximately one mile to new premises
Handling and transport

Sorted, banded and moved securely

The dismantling process kept beams, frames and braces organised so the heavy-duty pallet racking could be transported securely and stored ready for the next stage.

Project gallery

Real photographs from the relocation

Heavy-duty pallet racking bays before dismantling and relocation
Pallet racking frames and beams prepared during the relocation project
Sorted pallet racking components ready to be banded for transport
Pallet racking components unloaded and stored ready for future rebuilding
Experience

Planned by experienced racking relocation crews

Rackstor UK Ltd brings 25 years of industry experience to pallet racking dismantling, transportation, reconfiguration and rebuilding projects.

Common questions

Pallet racking relocation FAQs

What pallet racking was relocated?

The project involved dismantling and relocating 23 bays of heavy-duty pallet racking with approximately 5-metre-high, 900mm-deep frames and 2.7-metre beams across three storage levels.

How were the racking components prepared for transport?

Every component, including beams, frames and braces, was sorted and securely banded for transport after dismantling.

How far was the pallet racking transported?

The dismantled pallet racking was transported approximately one mile to the new premises.

Was the racking rebuilt immediately at the new premises?

For this project, the racking was unloaded and stored at the new premises ready for future rebuilding.