Pallet Racking Relocation - 23-Bay Warehouse Racking System
Twenty-three bays of heavy-duty pallet racking dismantled, sorted, banded and moved approximately one mile.

Dismantling and moving a 23-bay pallet racking system
Twenty-three bays of heavy-duty pallet racking were dismantled and relocated to new premises approximately one mile away.
The system included approximately 5-metre-high, 900mm-deep racking frames with 2.7-metre beams across three storage levels.
Every component, including beams, frames and braces, was sorted and securely banded for transport before being unloaded and stored ready for future rebuilding.
- 23 bays of heavy-duty pallet racking
- Approximately 5-metre-high, 900mm-deep frames
- 2.7-metre beams across three storage levels
- Moved approximately one mile to new premises
Sorted, banded and moved securely
The dismantling process kept beams, frames and braces organised so the heavy-duty pallet racking could be transported securely and stored ready for the next stage.
Real photographs from the relocation




Planned by experienced racking relocation crews
Rackstor UK Ltd brings 25 years of industry experience to pallet racking dismantling, transportation, reconfiguration and rebuilding projects.
Pallet racking relocation FAQs
What pallet racking was relocated?
The project involved dismantling and relocating 23 bays of heavy-duty pallet racking with approximately 5-metre-high, 900mm-deep frames and 2.7-metre beams across three storage levels.
How were the racking components prepared for transport?
Every component, including beams, frames and braces, was sorted and securely banded for transport after dismantling.
How far was the pallet racking transported?
The dismantled pallet racking was transported approximately one mile to the new premises.
Was the racking rebuilt immediately at the new premises?
For this project, the racking was unloaded and stored at the new premises ready for future rebuilding.