Pallet Racking Relocation Completed in Manchester
A 23-bay pallet racking system dismantled, relocated and reinstalled to maximise warehouse space while reusing existing equipment.

Relocating and reinstalling 23 pallet racking bays
The Manchester project involved the dismantling, relocation and reinstallation of a 23-bay pallet racking system.
The system was approximately 5 metres high and used 1100mm-deep frames with 2.7-metre beams across three storage levels. It included decking, and the beams were rated to a capacity of 2 tonnes.
Reinstalling the existing equipment helped the customer maximise the available warehouse space while continuing to reuse the racking system.
- 23 pallet racking bays
- Approximately 5 metres high
- 2.7-metre beams across three storage levels
- 1100mm-deep frames
- Decking included
- Beams rated to 2 tonnes capacity
Existing equipment configured for the new space
The pallet racking was dismantled, relocated and reinstalled in the Manchester warehouse, enabling the existing system to be reused while maximising the available space.
Real photographs from the Manchester project






Experienced racking relocation crews
Rackstor UK Ltd brings approximately 25 years of industry experience to pallet racking dismantling, relocation and reinstallation projects.
Inspection and repair enquiries
For separate inspection and load-notice requirements, visit Rack Safety Inspections. For separate racking repair requirements, visit Racking Repairs.
Manchester pallet racking relocation FAQs
What did the Manchester pallet racking relocation involve?
The project involved dismantling, relocating and reinstalling a 23-bay pallet racking system in Manchester.
What were the pallet racking dimensions?
The system was approximately 5 metres high, with 1100mm-deep frames and 2.7-metre beams across three storage levels.
What capacity were the pallet racking beams rated to?
The beams were rated to a capacity of 2 tonnes and the system included decking.
Why was the existing pallet racking reinstalled?
Relocating and reinstalling the existing equipment helped the customer maximise warehouse space while continuing to reuse the racking system.